Laser scanning of an electrical substation
- Uncategorized

We are carrying out a floor plan and elevation survey at the Church of Santa Magdalena at Penedès Plan. Originally built in the 11th century, the 15th-century renovation introduced one of its most distinctive features: the bell tower constructed directly atop the cupola.
Work done in collaboration with the architect Ataulf Ferrer Mestres.


















